Published August 19, 1998 | Version v1
Report Open

K East basin sludge volume estimates for integrated water treatment system

Description

This document provides estimates of the volume of sludge expected from Integrated Process Strategy (IPS) processing of the fuel elements and in the fuel storage canisters in K East Basin. The original estimates were based on visual observations of fuel element condition in the basin and laboratory measurements of canister sludge density. Revision 1 revised the volume estimates of sludge from processing of the fuel elements based on additional data from evaluations of material from the KE Basin fuel subsurface examinations. A nominal Working Estimate and an upper level Working Bound is developed for the canister sludge and the fuel wash sludge components in the KE Basin

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050925; NTIS; US GOVT. PRINTING OFFICE DEP.

Files

30060132.pdf

Files (198.4 kB)

Name Size Download all
md5:6c6a3149c90c954f61003de4f1d5fc61
198.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
13 p.
Report number
HNF--3166-Rev.1