Published August 15, 2001 | Version v1
Report Restricted

Technical design aspects of Feasibility Study-II

Description

Feasibility Study-II examined a high-performance Neutrino Factory providing 1 x 1020 neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration ration (MC) and is based on a 1 MW proton driver operating at 24 GeV, i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R and D activities are also described briefly

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00787167; PURL: https://www.osti.gov/servlets/purl/787167-615AxH/native/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
LBNL--48814

Conference

Title
3. International Workshop on Neutrino Factories based on Muon Storage Rings, NuFACT'01
Dates
24-30 May 2001
Place
Tsukuba, Ibaraki (Japan)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
33000931
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
DESIGN; FEASIBILITY STUDIES; IMPLEMENTATION; MUONS; NEUTRINOS; PERFORMANCE; PROTONS; STORAGE RINGS
Descriptors DEC
BARYONS; CATIONS; CHARGED PARTICLES; ELEMENTARY PARTICLES; FERMIONS; HADRONS; HYDROGEN IONS; HYDROGEN IONS 1 PLUS; IONS; LEPTONS; MASSLESS PARTICLES; NUCLEONS