Published May 27, 2009 | Version v1
Report Restricted

CH Packaging Operations Manual

Description

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing 'Short' 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing 'Tall' 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

Availability note (English)

Also available from WIPP Information Center - 1-800-336-9477; OSTI as DE00988286; PURL: https://www.osti.gov/servlets/purl/988286-CXwNrl/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
141 p.
Report number
DOE/WIPP--02-3184/Rev.9

Optional Information