Published December 1, 2016 | Version v1
Journal article

Emergency operating procedures improvement based on the lesson learned from the Fukushima Daiichi accident

  • 1. Institute of Nuclear Engineering and Science, National Tsing Hua University, No. 101, Sec. 2, Guangfu Rd., Hsinchu City 300, Taiwan (China)
  • 2. Atomic Energy Council, 2F., No. 80, Sec.1, Chenggong Rd., Yonghe Dist., New Taipei City 234, Taiwan (China)
  • 3. Institute of Nuclear Energy Research, Atomic Energy Council, No. 1000, Wenhua Rd., Jiaan Village, Longtan Township, Taoyuan County 325, Taiwan (China)

Description

Highlights: • Discuss the problem of EOPs at the time of Fukushima accident to deal with the prolonged SBO. • Elaborate the potential risk accompanied with the emergency depressurization in the SBO. • Describe a special guideline to cope with Fukushima-like accidents and provide its technical basis. • Point out that Fukushima accident might have been prevented if improved EOPs had been used. • Propose key points and suggestions for improving the EOPs. - Abstract: One of the lessons learned from the Fukushima Daiichi accident is the emergency operating procedures (EOPs) have to be improved. The BWR Owners' Group revised the emergency procedure guidelines and addressed the lesson learned from the Fukushima Daiichi accident in revision 3 in order to avoid loss of turbine-driven makeup water systems during reactor depressurization. However, the improvement deserves much more attention. The existing EOPs at the time of the accident may not be adequate enough for the prolonged station blackout condition, because resources required for performing the EOPs are vastly unavailable or gradually exhausted. The improved EOPs must not only permit early reactor pressure vessel depressurization, but also address the risk accompanied with the emergency depressurization. For this reason, Taiwan Power Company proposed the Ultimate Response Guideline (URG) to cope with Fukushima-like accidents. The main content of the URG is a two-stage depressurization strategy, namely the controlled depressurization and the emergency depressurization. The technical basis of the two-stage depressurization strategy was discussed in this paper. The effectiveness of the URG was verified by using TRAC/RELAP Advanced Computational Engine (TRACE). Besides, the emergency responses performed by Fukushima Daini nuclear power plant (Fukushima Daini NPP) were found to be very similar to the URG. The consequences of Fukushima Daini NPP somehow demonstrate that the URG is effective for Fukushima-like situation. Effective strategies for coping with Fukushima-like accidents are worthwhile to be integrated into the improved EOPs. The Fukushima Daiichi accident might have been prevented if the improved EOPs had been used, even with the existing design of Fukushima Daiichi NPP at the time of the accident.

Availability note (English)

Available from http://dx.doi.org/10.1016/j.nucengdes.2016.09.011

Additional details

Identifiers

DOI
10.1016/j.nucengdes.2016.09.011;
PII
S0029-5493(16)30329-6;

Publishing Information

Journal Title
Nuclear Engineering and Design
Journal Volume
309
Journal Page Range
p. 53-64
ISSN
0029-5493
CODEN
NEDEAU

Optional Information

Copyright
Copyright (c) 2016 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.