Results of second regular inspection of No.3 plant in the Takahama Power Station, Kansai Electric Power Co., Inc
Creators
Description
The second regular inspection of No.3 plant in the Takahama Power Station was carried out from March 20 to June 11, 1987. The parallel operation was resumed on May 21, 1987, 63 days after the parallel off. The facilities as the object of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation, and emergency power generation system. On these facilities as the object of inspection, the appearance, disassembling, leak, function, performance and other inspections were carried out. As the result, abnormality was not found at all. The works related to this regular inspection were accomplished within the range of allowable radiation dose based on the relevant laws. Major reconstruction work was not carried out during the period of this regular inspection. (Kako, I.)
Additional details
Publishing Information
- Journal Title
- Genshiryoku Anzen Iinkai Geppo
- Journal Issue
- no.107
- Series
- Genshiryoku Anzen Iinkai Geppo.
- CODEN
- GAIGD
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 19089452
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- EXTERNAL IRRADIATION; INSPECTION; INTERNAL IRRADIATION; RADIATION DOSES; REACTOR MAINTENANCE; TAKAHAMA-3 REACTOR
- Descriptors DEC
- ENRICHED URANIUM REACTORS; IRRADIATION; MAINTENANCE; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS