Published May 2008 | Version v1
Journal article

Sequential time-step generation companies decisions in oligopolistic electricity market

  • 1. Programa de Graduados e Investigacion en Ingenieria Electrica, Departamento de Ingenieria Electrica y Electronica del Instituto Tecnologico de Morelia, Morelia, Michoacan (Mexico)

Description

This paper studies the production decisions of generation companies (GENCOs) which are fully engaged in oligopolistic electricity markets. The model presented is based upon the static equilibrium model solved sequentially in time. By decomposing the problem in time, each time-step is solved independently using a Cournot-like market model. The time dimension is divided into discrete, 1-h time-steps. The model also incorporates the effects of technical and temporal constraints such as time on/off and ramp up/down. Since GENCOs tend toward repetitive decision-making, they can more easily learn from the market. The concept of forward expectations and the lessons derived from the market are introduced, and several numerical examples are provided. (author)

Availability note (English)

Available from: http://dx.doi.org/10.1016/j.epsr.2007.06.003

Additional details

Identifiers

Publishing Information

Journal Title
Electric Power Systems Research
Journal Volume
78
Journal Issue
5
Journal Page Range
p. 824-834
ISSN
0378-7796
CODEN
EPSRDN

INIS

Country of Publication
Netherlands
Country of Input or Organization
Netherlands
INIS RN
39083920
Subject category
S24: POWER TRANSMISSION AND DISTRIBUTION;
Resource subtype / Literary indicator
Numerical Data
Descriptors DEI
COMPETITION; COST; DECISION MAKING; ELECTRIC POWER; ELECTRICITY; MARKET; NUMERICAL DATA; POWER GENERATION; POWER SYSTEMS; PROFITS
Descriptors DEC
DATA; ENERGY SYSTEMS; INFORMATION; POWER

Optional Information

Notes
Elsevier Ltd. All rights reserved