Sequential time-step generation companies decisions in oligopolistic electricity market
Creators
- 1. Programa de Graduados e Investigacion en Ingenieria Electrica, Departamento de Ingenieria Electrica y Electronica del Instituto Tecnologico de Morelia, Morelia, Michoacan (Mexico)
Description
This paper studies the production decisions of generation companies (GENCOs) which are fully engaged in oligopolistic electricity markets. The model presented is based upon the static equilibrium model solved sequentially in time. By decomposing the problem in time, each time-step is solved independently using a Cournot-like market model. The time dimension is divided into discrete, 1-h time-steps. The model also incorporates the effects of technical and temporal constraints such as time on/off and ramp up/down. Since GENCOs tend toward repetitive decision-making, they can more easily learn from the market. The concept of forward expectations and the lessons derived from the market are introduced, and several numerical examples are provided. (author)
Availability note (English)
Available from: http://dx.doi.org/10.1016/j.epsr.2007.06.003Additional details
Identifiers
Publishing Information
- Journal Title
- Electric Power Systems Research
- Journal Volume
- 78
- Journal Issue
- 5
- Journal Page Range
- p. 824-834
- ISSN
- 0378-7796
- CODEN
- EPSRDN
INIS
- Country of Publication
- Netherlands
- Country of Input or Organization
- Netherlands
- INIS RN
- 39083920
- Subject category
- S24: POWER TRANSMISSION AND DISTRIBUTION;
- Resource subtype / Literary indicator
- Numerical Data
- Descriptors DEI
- COMPETITION; COST; DECISION MAKING; ELECTRIC POWER; ELECTRICITY; MARKET; NUMERICAL DATA; POWER GENERATION; POWER SYSTEMS; PROFITS
- Descriptors DEC
- DATA; ENERGY SYSTEMS; INFORMATION; POWER
Optional Information
- Notes
- Elsevier Ltd. All rights reserved