There is a newer version of the record available.

Published October 2009 | Version v1
Miscellaneous

A Study on OBE Exceedance Criteria Using the CAV Concept for NPPs in Korea

  • 1. Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)
  • 2. Korea Electric Power Research Institute, Daejeon (Korea, Republic of)

Description

NPPs in Korea have so far complied with the US Regulatory Guide 1.12 Rev.1 (1974) for the seismic monitoring systems. However, researchers in Korea have been considering attempting to comply with Regulatory Guide 1.12 rev.2 (1997) when implementing all future seismic monitoring systems. To comply with the new regulations, Operating Basis Earthquake (OBE) Exceedance Criteria applied with the Cumulative Absolute Velocity (CAV) has to be developed for local use. The CAV was developed in the USA as one reasonable OBE exceedance criterion for NPPs; however, it has not been widely used outside the USA, not-withstanding its solid technical basis. It is, however, expected that the worldwide NPP construction boom will necessitate development and more frequent use of reasonable OBE exceedance criteria. As multi-units (four or more) are situated in one site in Korea, prevention of simultaneous shutdown of multi-unit caused by non damaging earthquakes is very important; otherwise, a serious economic loss could occur, and there could also be a great impact on the stability of the power grid that would arise due to the unnecessary shutdown. Actually, we have had the experience of observing a Peak Ground Acceleration (PGA)-value greater than 0.1g (the current OBE level for Korean NPPs) due to an M=4.8 earthquake (20th Jan. '07) that did not even cause any damage to the poorly-designed structures nearby. This experience gave a motivation to the KHNP should concern the needs of study on OBE exceedance criteria in view of application of the CAV to Korean seismic situation, which will be more practical. The present paper is intended to show the intermediate result of the research on Operating Basis Earthquake (OBE) exceedance criteria in Korea

Part of:
Transactions of the Korean Nuclear Society Autumn Meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2009 autumn meeting of the KNS
Dates
29-30 Oct 2009
Place
Kyungju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
41027429
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
EARTHQUAKES; MONITORING; NUCLEAR POWER PLANTS; SEISMIC EFFECTS; SHUTDOWN
Descriptors DEC
NUCLEAR FACILITIES; POWER PLANTS; SEISMIC EVENTS; THERMAL POWER PLANTS

Optional Information

Notes
5 refs, 3 figs