Published December 1985 | Version v1
Journal article

Investigation of cool down processes in a NPP turbine of the K-1000-60/1500 type

Description

Methods of mathematical simulation were used to investigate cooling-off dynamics of separate NPP turbine parts of the K-1000-60/1500 type during shutdowns of different duration. Investigations indicated that a flange section of horizontal external casing joint in the steam inlet zone of the intermediate pressure casing is a main place limiting duration of turbine starting regime. When strengthening thermal protection of branch pipes, turbine start-up time (after shutdown during 72-168 h) can be reduced by 0.25-0.3 h; if also pick-ups are isolated than reduction of start-up duration will constitute 0.5-0.7 h. During shutdowns of shorter duration all critical assemblies will not limit in practice time of starting regime

Additional details

Additional titles

Original title (Russian)
Исследование процессов остывания турбины АЭС типа К-1000-60/1500

Publishing Information

Journal Title
Teploehnergetika
Journal Issue
no.12
Series
Teploehnergetika.
ISSN
0040-3636
CODEN
TPLOA

INIS

Country of Publication
Russian Federation
Country of Input or Organization
USSR
INIS RN
17062656
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Descriptors DEI
COOLING; DIAGRAMS; NUCLEAR POWER PLANTS; STEAM TURBINES; TIME DEPENDENCE
Descriptors DEC
INFORMATION; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS; TURBINES

Optional Information

Notes
For English translation see the journal Thermal Engineering (UK).