Published July 29, 1998 | Version v1
Report Open

324 Facility B-cell quality process plan

Description

B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. These include: Size Reduce Tank 119 and Miscellaneous Equipment; Load and Ship Low-Level Waste; Remove and Size Reduce the 1B Rack; Collect Dispersible Material from Cell Floor; Remove and Size Reduce the 2A Rack; Size Reduce the 1A Rack; Load and Ship Mixed Waste to PUREX Tunnels; and Move Spent Fuel to A-Cell;

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050884; NTIS; US GOVT. PRINTING OFFICE DEP.

Files

30046634.pdf

Files (187.9 kB)

Name Size Download all
md5:76eaf1ed312d6aefbe3b8523b3182b12
187.9 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
17 p.
Report number
HNF--2286-Rev.3