Last Year of PEP-II B-Factory Operation
Description
The PEP-II B-Factory at SLAC (3.1 GeV e+ x 9.0 GeV e-) operated from 1999 to 2008, delivering luminosity to the BaBar experiment. The design luminosity was reached after one and a half years of operation. In the end PEP-II surpassed by four times its design luminosity reaching 1.21 x 1034 cm-2 s-1. It also set stored beam current records of 2.1 A e- and 3.2 A e+. Continuous injection was implemented with BaBar taking data. The total delivered luminosity to the BaBar detector was 557.4 fb-1 spanning five upsilon resonances. PEP-II was constructed by SLAC, LBNL, and LLNL with help from BINP, IHEP, the BaBar collaboration, and the US DOE OHEP.
Availability note (English)
Available from http://www.slac.stanford.edu/cgi-wrap/getdoc/slac-pub-14677.pdf; http://www.slac.stanford.edu/cgi-wrap/pubpage?slac-pub-14677.html; PURL: https://www.osti.gov/servlets/purl/1028693/Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 5 p.
- Report number
- SLAC-PUB--14677
Conference
- Title
- 11. European Particle Accelerator Conference
- Acronym
- EPAC'08
- Dates
- 23-27 Jun 2008
- Place
- Genoa (Italy)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 43003019
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATORS; BEAM CURRENTS; LUMINOSITY; MEETINGS; OPERATION; PEP STORAGE RINGS
- Descriptors DEC
- CURRENTS; OPTICAL PROPERTIES; PHYSICAL PROPERTIES; STORAGE RINGS
Optional Information
- Contract/Grant/Project number
- AC02-76SF00515
- Notes
- Conf.Proc.C0806233:tuxg01,2008
- Funding organization
- US Department of Energy (United States)