Published 1989 | Version v1
Book

Sizewell 'B' - the first of the UK PWR power stations

Description

On 1 April 1987 the Sizewell 'B' project was finally given the go-ahead, the task being to build Britain's first pressurized water reactor (PWR) nuclear power station. Although based on the Westinghouse four-loop design, the station will have many unique features to accommodate operational and safety requirements within the United Kingdom. The Conference on 'Sizewell 'B' - The First of the UK PWR Power Stations', held in Manchester during September 1989, and organized by the Institution of Mechanical Engineers, provided the opportunity for contractors and the project's management team to discuss the ways in which these requirements are being met. There are twenty-seven papers from the different sessions, all indexed separately. Sessions included: PWR Power Stations for the UK, Power Station Design and Safety Assurance, Nuclear Systems, Turbine Generator Systems, Control Systems, Nuclear Components, Equipment Qualification and Containment Design. (author)

Additional details

Publishing Information

Publisher
Mechanical Engineering Publications Ltd.
Imprint Place
Bury St Edmunds (UK)
ISBN
0 85298 694 7
Imprint Pagination
277 p.
Journal Issue
no. 1989-8
Series
IMechE Conference Series.

Conference

Title
Conference on Sizewell 'B' - the first of the UK PWR power stations.
Dates
13-14 Sep 1989.
Place
Manchester (UK).