Published 1991 | Version v1
Book

An overview of the preparation of finishing Line 4 and 5. Fully developed safety case

Creators

  • 1. British Nuclear Fuels plc, Sellafield (United Kingdom)

Description

In 1989 a fully developed Safety Case (fdSC) was prepared for the plutonium finishing facility. The facility is modern and operates largely without operator intervention. This paper gives an overview of the facility and the criticality safety assessment prepared as part of this fdSC. The potential hazards within the facility were identified by use of the HAZOP technique. Where possible the safety of the facility was demonstrated using simple hand calculations. However in a number of cases Monte Carlo computer calculations were performed to supplement this approach. In other cases it was not possible to produce deterministic arguments to demonstrate safety and for these the technique of Probabilistic Risk Assessment were used. In this way it was possible to demonstrate that the frequency of criticality within the facility was acceptably remote. (author)

Part of:
ICNC '91: international conference on nuclear criticality safety

Additional details

Additional titles

Augmented title (English)
Plutonium finishing facility at Sellafield

Publishing Information

Publisher
AEA Technology.
Imprint Place
Winfrith (United Kingdom)
Imprint Title
ICNC '91: international conference on nuclear criticality safety
Imprint Pagination
374 p.
Journal Page Range
v. 2 p. V.52-V.5

Conference

Title
international conference on nuclear criticality safety.
Acronym
ICNC '91
Dates
9-13 Sep 1991.
Place
Oxford (United Kingdom).

Optional Information

Notes
Imprint:Conference published in 3 v.