Published April 1977
| Version v1
Report
Restricted
Primary containment intergrated leakage rate testing
Description
Primary containment integrated leakage rate tests (ILRTs) have previously been conducted with a minimum duration of 24 hr. However, analysis of data from recent ILRTs has shown that a test duration considerably less than 24 hr would have been sufficient. This report summarizes these recent ILRTs and analyzes and discusses the test results. Test and analytical methods, including the LEAKFIT computer program, are also discussed. The conclusion is reached that an ILRT with a duration of 6 hr and at least 20 data points is sufficient
Availability note (English)
MF available from INIS under the Report Number; Stone and Webster Engineering Corp., Boston, MA.
Files
Additional details
Additional titles
- Augmented title (English)
- PWR and BWR
Publishing Information
- Imprint Pagination
- 90 p.
- Report number
- SWECO--7506
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 8347804
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- ACCURACY; BWR TYPE REACTORS; CONTAINMENT SYSTEMS; EFFICIENCY; LEAK TESTING; PWR TYPE REACTORS
- Descriptors DEC
- CONTAINMENT; REACTORS; TESTING; WATER COOLED REACTORS; WATER MODERATED REACTORS