Published April 1977 | Version v1
Report Restricted

Primary containment intergrated leakage rate testing

Description

Primary containment integrated leakage rate tests (ILRTs) have previously been conducted with a minimum duration of 24 hr. However, analysis of data from recent ILRTs has shown that a test duration considerably less than 24 hr would have been sufficient. This report summarizes these recent ILRTs and analyzes and discusses the test results. Test and analytical methods, including the LEAKFIT computer program, are also discussed. The conclusion is reached that an ILRT with a duration of 6 hr and at least 20 data points is sufficient

Availability note (English)

MF available from INIS under the Report Number; Stone and Webster Engineering Corp., Boston, MA.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Augmented title (English)
PWR and BWR

Publishing Information

Imprint Pagination
90 p.
Report number
SWECO--7506