Published 1996 | Version v1
Book

A practical implementation procedure for risk-based inservice inspection

  • 1. Electric Power Research Inst., Charlotte, NC (United States)
  • 2. SARTREX Corp., Rockville, MD (United States)
  • 3. Yankee Atomic Electric Co., Bolton, MA (United States)

Description

Recently, the ASME Section XI Working Group on Implementation of Risk-Based Examination produced a code case to define risk-based selection rules that could be used for inservice inspection of Class 1, 2, and 3 piping. To provide guidelines for practical implementation of the code case by utilities, EPRI sponsored work to develop evaluation procedures and criteria for defining risk-based inservice inspection programs for nuclear power plant piping. These procedures and criteria include efficient means to identify risk significant piping segments and inspection locations, and are based on evaluations of the potential for and the consequences of piping failure. These procedures have been applied in a pilot study to assess the feasibility of successfully implementing risk-based inservice inspection programs at nuclear plants. The results from the pilot study indicate that implementation of risk-based inservice inspection programs can reduce the cost and radiation exposure associated with inservice inspection, while maintaining a high level of safety

Additional details

Publishing Information

Publisher
American Society of Mechanical Engineers.
Imprint Place
New York, NY (United States)
ISBN
0-7918-1226-X
Imprint Title
ICONE-4: Proceedings. Volume 3: Safety and reliability
Imprint Pagination
595 p.
Journal Page Range
p. 335-342.

Conference

Title
ASME/JSME international conference on nuclear engineering.
Acronym
ICONE 4
Dates
10-13 Mar 1996.
Place
New Orleans, LA (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
27062878
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ECCS; EVALUATION; FEASIBILITY STUDIES; IN-SERVICE INSPECTION; MITIGATION; NUCLEAR POWER PLANTS; PIPES; RECOMMENDATIONS; RISK ASSESSMENT
Descriptors DEC
ENGINEERED SAFETY SYSTEMS; INSPECTION; NUCLEAR FACILITIES; POWER PLANTS; REACTOR PROTECTION SYSTEMS; THERMAL POWER PLANTS

Optional Information

Secondary number(s)
CONF-960306--.