Published December 10, 2008 | Version v1
Report

Nuclear Nonproliferation

Description

With an explosion equivalent of about 20kT of TNT, the Trinity test was the first demonstration of a nuclear weapon. Conducted on July 16, 1945 in Alamogordo, NM this site is now a Registered National Historic Landmark. The concept and applicability of nuclear power was demonstrated on December 20, 1951 with the Experimental Breeder Reactor Number One (EBR-1) lit four light bulbs. This reactor is now a Registered National Historic Landmark, located near Arco, ID. From that moment forward it had been clearly demonstrated that nuclear energy has both peaceful and military applications and that the civilian and military fuel cycles can overlap. For the more than fifty years since the Atoms for Peace program, a key objective of nuclear policy has been to enable the wider peaceful use of nuclear energy while preventing the spread of nuclear weapons. Volumes have been written on the impact of these two actions on the world by advocates and critics; pundits and practioners; politicians and technologists. The nations of the world have woven together a delicate balance of treaties, agreements, frameworks and handshakes that are representative of the timeframe in which they were constructed and how they have evolved in time. Collectively these vehicles attempt to keep political will, nuclear materials and technology in check. This paper captures only the briefest abstract of the more significant aspects on the Nonproliferation Regime. Of particular relevance to this discussion is the special nonproliferation sensitivity associated with the uranium isotope separation and spent fuel reprocessing aspects of the nuclear fuel cycle

Availability note (English)

Available from https://e-reports-ext.llnl.gov/pdf/368425.pdf; PURL: https://www.osti.gov/servlets/purl/945657-vCiXIY/

Additional details

Publishing Information

Imprint Pagination
8 p.
Report number
LLNL-CONF--409385

Conference

Title
Introduction to Nuclear Chemistry and Fuel Cycle Separations
Dates
16-18 Dec 2008
Place
Nashville, TN (United States)

Optional Information

Contract/Grant/Project number
W-7405-ENG-48
Notes
PDF-FILE: 8; SIZE: 0.1 MBYTES
Funding organization
US Department of Energy (United States)