Published 2006 | Version v1
Book

Economic Analysis of the Leveled Cost of Electricity Generation

  • 1. Instituto Nacional de Investigaciones Nucleares, Carretera Mexico-Toluca s/n, La Marquesa, Estado de Mexico 52750 (Mexico)

Description

Nuclear option is currently a cost competitive option due to among other things the high natural gas prices volatility. Currently, the overnight cost for a new nuclear power plant is estimated between 1200 and 1600 USD/kW with an output power between 1100 and 1600 MWe, construction time, from first concrete to commercial operation, is about five years as it has been demonstrated in the last reactors built in Asia (e.g. Japan and China). In this paper a leveled electricity cost analysis is performed to compared different scenarios of electricity generation using combined cycles by using natural gas and nuclear power stations. A nuclear reactor leveled cost analysis for several overnight costs is performed. Also a sensitivity analysis for construction time and capacity factors is offered. The scenarios considered comprise three different discount rates, 5%, 8% and 10%. (authors)

Part of:
Validation of the TRACE Code Against Post-Dryout Experiments in Tubes and Annuli

Additional details

Publishing Information

Publisher
American Nuclear Society - ANS
Imprint Place
La Grange Park (United States)
ISBN
0-89448-698-5
Imprint Title
Proceedings of the 2006 international congress on advances in nuclear power plants - ICAPP'06
Imprint Pagination
2734 p.
Journal Page Range
p. 1046-1050

Conference

Title
2006 International congress on advances in nuclear power plants - ICAPP'06
Dates
4-8 Jun 2006
Place
Reno - Nevada (United States)

Optional Information

Notes
7 refs.