Published August 2015 | Version v1
Miscellaneous

Development of thermostatic unit for new magnet power supply at J-PARC MR

  • 1. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)
  • 2. Universal Engineering, Mito, Ibaraki (Japan)

Description

In J-PARC Main Ring (MR), we plan to shorten the driving cycle from 2.48 sec to about 1 sec for higher beam power. To achieve this, replacement of the power supplies of main magnets is mandatory. The digital control system is adopted to the power supply controller. This is because the digital control system enables us to implement complex algorithm into the controller and reproduce its configuration. In case of the digital control, the stability of the current measurement decides the performance of the controller. To maintain stable operation of our high intensity beam, the stability of the current measurement needs to be at ppm level. This needs the temperature control of the A/D convertor and its surrounding circuit (A/D board). We have developed a thermostatic unit for the A/D board and successfully control the temperature around the A/D board within our requirement level. In this article, we describe the details of the developed thermostatic unit. (author)

Availability note (English)

Available from http://www.pasj.jp/web_publish/pasj2015/proceedings/PDF/THP0/THP068.pdf
Part of:
Proceedings of the 12th annual meeting of Particle Accelerator Society of Japan

Additional details

Publishing Information

Imprint Title
Proceedings of the 12th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
1419 p.
Journal Page Range
p. 1149-1151

Conference

Title
12. annual meeting of Particle Accelerator Society of Japan
Dates
5-7 Aug 2015
Place
Tsuruga, Fukui (Japan)

Optional Information

Notes
2 refs., 4 figs., 1 tab.; This record replaces 48020413