Published 1974
| Version v1
Report
Restricted
Surry Power Station, Units 1 and 2. Semiannual operating report, July--December 1974
Description
Net electric power generated by Surry Unit 1 was 6,930,353 MWH with the generator on line for 10,417.7 hours. Net electric power generated by Unit 2 was 5,699,299 MWH with the generator on line for 8,384.2 hours. Information is presented concerning operation, radioactive effluent releases, solid radioactive wastes, fuel shipments, occurrences in which temperature limitations on the condenser cooling water discharge were exceeded, changes in station organization, occupational personnel radiation exposure, nonradiological monitoring including thermal, physical, and biological programs, and the radiological environmental monitoring program. (U.S.)
Availability note (English)
MF available from INIS under the Report Number.
Files
Additional details
Publishing Information
- Imprint Pagination
- 546 p.
- Report number
- DOCKET-50280--312
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 6207326
- Subject category
- S99: GENERAL AND MISCELLANEOUS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- COOLING; ENVIRONMENT; FISSION PRODUCT RELEASE; FUEL ELEMENTS; MONITORING; PERSONNEL; POWER GENERATION; RADIATION DOSES; RADIATION MONITORING; RADIOACTIVE WASTE DISPOSAL; REACTOR OPERATION; SOLID WASTES; STEAM CONDENSERS; SURRY-1 REACTOR; SURRY-2 REACTOR; THERMAL EFFLUENTS; TRANSPORT
- Descriptors DEC
- ENRICHED URANIUM REACTORS; MANAGEMENT; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTORS; THERMAL REACTORS; VAPOR CONDENSERS; WASTE DISPOSAL; WASTE MANAGEMENT; WASTES; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Secondary number(s)
- DOCKET-50281--301.