Published October 2016
| Version v1
Miscellaneous
Development of Abnormal Operating Strategies for Loss of Ultimate Heat Sink (LOUHS) at Shutdown Mode in Westinghouse Type Nuclear Power Plant
- 1. KHNP CRI, Daejeon (Korea, Republic of)
- 2. FNC Tech. Co., Yongin (Korea, Republic of)
Description
Loss of all AC power is classified as one of multiple failure accident by regulatory guide of Korean accident management program. Therefore we need develop strategies for the abnormal operating procedure both of power operating and shutdown mode. This paper developed abnormal operating guideline for loss of all AC power by analysis of accident scenario in pressurized water reactor. This paper analyzed the extended SBO in shutdown operating mode and developed the operating strategy of the abnormal operation procedure. Operator action for the emergency are not required to take in 500 minutes and 60 minutes in intact and opened RCS state respectively
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Daejeon (Korea, Republic of)
- Imprint Title
- Proceedings of the KNS 2016 Autumn Meeting
- Imprint Pagination
- [1 CD-ROM]
- Journal Page Range
- [2 p.]
Conference
- Title
- 2016 Autumn Meeting of the KNS
- Dates
- 26-28 Oct 2016
- Place
- Kyungju (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 48067421
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- FAILURES; HEAT SINKS; MAINTENANCE; REACTOR SHUTDOWN; RECOMMENDATIONS; SAFETY; VERIFICATION; WESTINGHOUSE STANDARD REACTOR
- Descriptors DEC
- ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTOR LIFE CYCLE; REACTORS; SHUTDOWN; SINKS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 3 refs, 4 figs, 2 tabs