Published March 2005 | Version v1
Book

Status report of the 14 UD Pelletron Accelerator Facility, BARC-TIFR

  • 1. Nuclear Physics Div., Bhabha Atomic Research Centre, Mumbai (India)

Description

A 14 UD Pelletron Accelerator Facility has been operational since 1989. The project MEHIA (Medium Energy Heavy Ion Accelerator) started in 1982 and was formally inaugurated on 30th December 1988. In this paper we present the status of the accelerator, performance for the year 2004 and new features that have added during the above mentioned period. (author)

Part of:
DAE-BRNS Indian particle accelerator conference-2005

Additional details

Publishing Information

Publisher
Variable Energy Cyclotron Centre
Imprint Place
Kolkata (India)
Imprint Title
DAE-BRNS Indian particle accelerator conference-2005
Imprint Pagination
628 p.
Journal Page Range
p. 31-32

Conference

Title
DAE-BRNS Indian particle accelerator conference
Acronym
InPAC-2005
Dates
1-5 Mar 2005
Place
Kolkata (India)

INIS

Country of Publication
India
Country of Input or Organization
India
INIS RN
37006425
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM BUNCHERS; ION BEAM INJECTION; MAINTENANCE; PELLETRON ACCELERATORS; PERFORMANCE; PROTON BEAMS; RF SYSTEMS; SPECIFICATIONS
Descriptors DEC
ACCELERATORS; BEAM INJECTION; BEAMS; ELECTROSTATIC ACCELERATORS; NUCLEON BEAMS; PARTICLE BEAMS

Optional Information

Notes
2 figs.