Summary for Z-Petawatt Laser Activities (CY2019)
Description
The high-energy upgrade of the Z-Petawatt (ZPW) laser system involved a shot hiatus starting in October 2018 to allow the installation of full-aperture optics in the chain, including in the main amplifier section as well as in the branches associated with the ZPW compressor and co-injection (the narrowband nanosecond operating mode that is co-bored with Z-Beamlet). Laser shots resumed May 1st, with most shots since being in the ns mode to reduce complexity (while conditioning optics and calibrating diagnostics) as well as to support experimental requests. To facilitate experimental needs while a final full-sized co-injection optic was prepared, a sub-apertured beam has been used for experimental applications and a full-apertured beam has been used to validate the system. In the latter case, the beam is directed to a large calorimeter placed before branching occurs to the ZPW compressor or co-injection. As of September 2019, full-aperture co-injection shots had ramped up to 960J in 2.3ns, with many cross-calibrations being used to map out a relative humidity dependency in the leaky diagnostic mirror. Several such cross-calibration shots have been done using a chirped pulse seed as well, verifying that the diagnostic calibrations are valid in both broadband and narrow-band modes. Summarizing, since May 1st of 2019 when shots resumed, 93 full system shots were performed with the ZPW laser. This included 2 co-injection shots with ZBL into Z (in support of MagLIF), 26 Pecos gas cell shots (in support of MagLIF), 11 Conchas gas cell shots (in support of UXI applications development), 6 Jemez shots (in support of backlighter development), and 48 calorimeter shots (in support of validating the system performance). Of these 93 shots, 45 shots were in conjunction with ZBL.
Availability note (English)
Available from https://www.osti.gov/servlets/purl/1593232; https://www.osti.gov/biblio/1593232; DOE Accepted Manuscript full text, or the publishers Best Available Version will be available free of charge after the embargo periodAdditional details
Identifiers
Publishing Information
- Imprint Pagination
- 14 p.
- Report number
- SAND--2020-0438R
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 55006573
- Subject category
- S46: INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY; S71: CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSICS;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- BEAMS; BRANCHING RATIO; LASERS; OPTICS
- Descriptors DEC
- DIMENSIONLESS NUMBERS
Optional Information
- Contract/Grant/Project number
- Contract AC04-94AL85000; NA0003525
- Funding organization
- USDOE National Nuclear Security Administration (NNSA) (United States)
- Secondary number(s)
- OSTIID--1593232