Published December 1995 | Version v1
Report Open

Addendum 4 to CSAR 81-001, Installation of an Official Critical Drain on the Plexiglass Contamination Barrier in HC-227T Hood

Description

This report defines the maximum space allowed between the floor surface and the lower edge of an official criticality drain which is to be installed on the plexiglas contamination barrier in HC-227T Hood

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE97051470; NTIS; US Govt. Printing Office Dep.

Files

28075105.pdf

Files (123.5 kB)

Name Size Download all
md5:7a73877b5111f796cbd70f704ec80b57
123.5 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
9 p.
Report number
WHC-SD--SQA-CSA-30007