Published January 1985 | Version v1
Report Open

Report on tests using a flow visualization rig - three channel per pass configuration

  • 1. Monserco Ltd., Montreal (Canada)

Description

The flow visualization rig was upgraded to have 3 heated channels per pass. A series of natural circulation flow tests were done. Under test conditions, long periods of flow stagnation with high heater temperatures were observed in one of the channels. This 3 channel per pass rig shows flow patterns with some reverse channel flows, together with continued heat removal by the boiler

Availability note (English)

MF available from INIS under the Report Number.

Files

16078240.pdf

Files (1.6 MB)

Name Size Download all
md5:efa8e4490c86ad3847fd2f56138bb8cd
1.6 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
115 p.
Report number
INFO--0148-2

Optional Information

Contract/Grant/Project number
Contract 02SQ.84055-3-4111