Published August 1983 | Version v1
Report Open

Survey and alignment for a 20-TeV on 20-TeV collider

Description

The effects of magnet misalignments in a 20-TeV on 20-TeV anti pp collider are simulated numerically. Both short-range and long-range alignment errors are considered for an example lattice design, and closed-orbit errors are simulated. Finally, closed orbit corrections using a least-squares scheme are performed. Automatic surveying methods are attractive for a multi-TeV collider, because of the large accelerator circumference, the large number of magnets, and the small tunnel cross section. The specific example of an automatic surveying scheme based upon an Inertial Navigation System is discussed, and the most important sources of error are described

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE84003042.

Files

15025244.pdf

Files (190.8 kB)

Name Size Download all
md5:0f698457d7dfd953f72cb3dc501f8133
190.8 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
LBL--16019

Conference

Title
12. international conference on high energy accelerators.
Dates
11-16 Aug 1983.
Place
Batavia, IL (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
15025244
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ACCELERATORS; ALIGNMENT; BEAM BENDING MAGNETS; COLLIDING BEAMS; COMPUTER CALCULATIONS; LEAST SQUARE FIT; MAGNETIC FIELDS; NUMERICAL SOLUTION; PROTON BEAMS; SIMULATION; TEV RANGE
Descriptors DEC
BEAMS; ENERGY RANGE; EQUIPMENT; MAGNETS; MAXIMUM-LIKELIHOOD FIT; NUCLEON BEAMS; PARTICLE BEAMS

Optional Information

Secondary number(s)
CONF-830822--40.