Published 1983 | Version v1
Book

Improvement in MFTF data base system response times

  • 1. Lawrence Livermore National Laboratory, Livermore, CA

Description

The Supervisory Control and Diagnostic System for the Mirror Fusion Test Facility (MFTF) has been designed as an event driven system. To this end the authors have designed a data base notification facility in which a task can request that it be loaded and started whenever an element in the data base is changed beyond some user defined range. The initial implementation of the notify facility exhibited marginal response times whenever a data base table with a large number of outstanding notifies was written into. In this paper they discuss the sources of the slow response and describe in detail a new structure for the list of notifies which minimizes search time resulting in significantly faster response

Additional details

Publishing Information

Publisher
I.E.E.E.
Imprint Place
New York, NY (USA)
Imprint Title
Fusion engineering. Vol. 2
Journal Page Range
p. 1912-1914.

Conference

Title
10. symposium on fusion engineering.
Dates
5-9 Dec 1983.
Place
Philadelphia, PA (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
16028794
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
DATA PROCESSING; DIAGNOSTIC TECHNIQUES; IMPLEMENTATION; INFORMATION SYSTEMS; MANAGEMENT; MFTF DEVICES; SPECIFICATIONS; TIME DEPENDENCE
Descriptors DEC
MAGNETIC MIRRORS; OPEN PLASMA DEVICES; THERMONUCLEAR DEVICES