Published December 1999 | Version v1
Miscellaneous Open

Annual report on the state of RB reactor components and equipment, december 1999

Creators

  • 1. Institute of Nuclear Sciences Vinca, Belgrade (Yugoslavia)

Description

According to the performed analysis, it is considered that the RB reactor can be operated safely until the existing control and safety systems could be maintained in satisfactory operable state. Failures of heavy water circulation system valves which may cause decreased availability but no accident. During 1998 the reactor lattice was changed 13 times, meaning that experiments were done with 13 configurations of the reactor core. Total reactor operation amounted to 84 Wh with 40 start-ups (attained criticality levels). This report contains 4 Annexes, detailed description of the state of reactor equipment in 1999, reactor operation nd utilization data, plan for regular annual maintenance and refurbishment of reactor equipment and plan for minimum needed resources for regular maintenance of the components and equipment in the forthcoming year

Availability note (English)

Available from INIS in electronic form; Also available from the Institute of nuclear sciences Vinca

Files

39043324.pdf

Files (293.7 kB)

Name Size Download all
md5:c2e1de579f034a7bcbdcea7e06cd3814
293.7 kB Preview Download

Additional details

Additional titles

Original title (Serbian)
Godisnji izvestaj o stanju opreme reaktora RB, Decembar 1999. godine

Publishing Information

Imprint Place
Beograd-Vinca (Yugoslavia)
Imprint Pagination
17 p.
Report number
INIS-RS--1294

Optional Information

Notes
2 tabs.
Secondary number(s)
NET/RB-MM--99