Regional boundaries study
Description
The NRC Office of Inspection and Enforcement (IE) has elected to evaluate the effectiveness and efficiency of its existing regional boundary alignment because of the anticipated future growth of nuclear power generating facilities and corresponding inspection requirements. This report documents a management study designed to identify, analyze, and evaluate alternative regional boundary configurations for the NRC/IE regions. Eight boundary configurations were chosen for evaluation. These configurations offered alternatives ranging from two to ten regions, and some included the concepts of subregional or satellite offices. Each alternative configuration was evaluated according to three major criteria: project workload, cost, and office location. Each major criterion included elements such as management control, program uniformity, disruption, costs, and coordination with other agencies. The conclusion reached was that regional configurations with regions of equal and relatively large workloads, combined with the concepts of subregional or satellite offices, may offer a significant benefit to the Office of Inspection and Enforcement and the Commission and are worthy of further study. A phased implementation plan, which is suitable to some configurations, may help mitigate the disruption created by realignment
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS. $9.50.
Files
Additional details
Publishing Information
- Imprint Pagination
- 206 p.
- Report number
- NUREG/CR--0072
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 10438385
- Subject category
- S99: GENERAL AND MISCELLANEOUS;
- Descriptors DEI
- INSPECTION; NUCLEAR POWER PLANTS; ORGANIZATIONAL MODELS; PLANNING; REACTOR LICENSING; REVIEWS; US NRC; USA
- Descriptors DEC
- DOCUMENT TYPES; LICENSING; NATIONAL ORGANIZATIONS; NORTH AMERICA; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS; US ORGANIZATIONS