This paper describes two special instrumentation packages in an integral economizer (preheater) steam generator of one of the first System 80 plants scheduled to go into commercial operation. The purpose of the instrumentation is to obtain accurate operating information from regions of the secondary side of the steam generator inaccessible to normal plant instrumentation. In addition to verification of the System 80 steam generator design predictions, the data obtained will assist in verification of steam generator thermal/hydraulic computer codes developed for generic use in the industry

Additional details

Additional titles

Augmented title (English)
PWR

Publishing Information

Journal Title
Am. Soc. Mech. Eng., [Pap.]
Journal Issue
80-c2/ne-12
Series
Am. Soc. Mech. Eng., [Pap.].
ISSN
0402-1215