Published 1988 | Version v1
Journal article

Implications of the Surry piping failure for other nuclear and fossil units

  • 1. Electric Power Research Inst., Palo Alto, CA (USA)

Description

A description is given of the key elements of an inspection plan to address utility concerns of flow assisted corrosion due to single-phase flow in carbon steel piping. The key elements of the plan are (a) where to look, (b) how to look, (c) when to look, and (d) how to respond. The plan is designed to provide utilities with the ability to predict piping thickness as a function of plant life for a given component and to assess the costs and benefits of a variety of remedy-repair options. The thrust of the inspection plan is to (a) conduct appropriate analysis and a limited but thorough baseline inspection program, (b) determine the extent of thinning, if any, and repair/replace components as necessary, and (c) perform follow-up inspections to confirm or quantify thinning and take longer term corrective actions (i.e. adjust chemistry, operating parameters, or others) as appropriate. (author)

Additional details

Publishing Information

Journal Title
International Journal of Pressure Vessels and Piping
Journal Volume
34
Series
Int. J. Press. Vessels Piping.
Journal Page Range
331-343
ISSN
0308-0161
CODEN
PRVPA

Conference

Title
5. International seminar on assuring structural integrity of steel reactor pressure boundary components.
Dates
24-25 Aug 1987.
Place
Davos (Switzerland).