Published July 1993 | Version v1
Report Open

Quality assurance project plan for the UMTRA technical assistance contractor hydrochemistry facility. Final report

Description

The Uranium Mill Tailings Remedial Action (UMTRA) hydrochemistry facility is used to perform a limited but important set of services for the UMTRA Project. Routine services include support of field-based hydrological and geochemical operations and water sampling activities. Less commonly, the hydrology and geochemistry staff undertake special studies and site characterization studies at this facility. It is also used to train hydrologists, geochemists, and groundwater sampling crews. A review of this Quality Assurance Project Plan (QAPP) shall be accomplished once each calendar year. This review will be targeted to be accomplished not sooner than 6 months and not later than 18 months after the last review

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95008755; NTIS; US Govt. Printing Office Dep.

Files

26050512.pdf

Files (733.1 kB)

Name Size Download all
md5:e5ac6e5fd94bf73447a863d488d3c9b3
733.1 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
32 p.
Report number
DOE/AL/62350--18F

Optional Information

Contract/Grant/Project number
Contract AC04-91AL62350
Funding organization
USDOE, Washington, DC (United States).