Published 1986
| Version v1
Report
Restricted
FFTF Work Control Center
Description
A centralized Work Control Center (WCC) is responsible for assuring that maintenance and modification of the Fast Flux Test Facility (FFTF) is performed in accordance with written procedures that ensure design integrity, personnel and public safety, and equipment and system availability for the computerized Master Information Data Acquisition System (MIDAS). Each maintenance task is logged into MIDAS from a Work Request from that has been reviewed and prioritized by the WCC. Thereafter, MIDAS is used to track schedule, manpower and material requirements; authorize field work; and close out the maintenance activity
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE87000866.
Files
Additional details
Publishing Information
- Imprint Pagination
- 5 p.
- Report number
- HEDL-SA--3385-FP
Conference
- Title
- Nuclear power plant maintenance meeting.
- Dates
- 23-27 Mar 1986.
- Place
- Salt Lake City, UT (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 18052754
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- AVAILABILITY; CONTROL SYSTEMS; DATA ACQUISITION SYSTEMS; FFTF REACTOR; MODIFICATIONS; PERSONNEL; REACTOR MAINTENANCE; SAFETY
- Descriptors DEC
- EPITHERMAL REACTORS; FAST REACTORS; LIQUID METAL COOLED REACTORS; MAINTENANCE; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; SODIUM COOLED REACTORS; TEST FACILITIES; TEST REACTORS
Optional Information
- Secondary number(s)
- CONF-860311--10.