Published 1986 | Version v1
Report Restricted

FFTF Work Control Center

Description

A centralized Work Control Center (WCC) is responsible for assuring that maintenance and modification of the Fast Flux Test Facility (FFTF) is performed in accordance with written procedures that ensure design integrity, personnel and public safety, and equipment and system availability for the computerized Master Information Data Acquisition System (MIDAS). Each maintenance task is logged into MIDAS from a Work Request from that has been reviewed and prioritized by the WCC. Thereafter, MIDAS is used to track schedule, manpower and material requirements; authorize field work; and close out the maintenance activity

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE87000866.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
HEDL-SA--3385-FP

Conference

Title
Nuclear power plant maintenance meeting.
Dates
23-27 Mar 1986.
Place
Salt Lake City, UT (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
18052754
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
AVAILABILITY; CONTROL SYSTEMS; DATA ACQUISITION SYSTEMS; FFTF REACTOR; MODIFICATIONS; PERSONNEL; REACTOR MAINTENANCE; SAFETY
Descriptors DEC
EPITHERMAL REACTORS; FAST REACTORS; LIQUID METAL COOLED REACTORS; MAINTENANCE; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; SODIUM COOLED REACTORS; TEST FACILITIES; TEST REACTORS

Optional Information

Secondary number(s)
CONF-860311--10.