Published June 23, 2004 | Version v1
Journal article

Options for the Cryogenic System for the BESSY-FEL

  • 1. Technische Universitaet Dresden, Lehrstuhl fuer Kaelte- und Kryotechnik, 01062 Dresden (Germany)
  • 2. Berliner Elektronenspeicherring-Gesellschaft fuer Synchrotronstrahlung (BESSY GmbH), 12489 Berlin (Germany)

Description

The Berliner Elektronenspeicherring-Gesellschaft fuer Synchrotronstrahlung (BESSY GmbH), in January 1999, started operation of BESSY II, a third-generation synchrotron light source delivering world-class, high-brilliance photon beams in the VUV to XUV spectral range. Based on this experience, BESSY has recently proposed the construction of a free-electron laser (FEL), covering a photon-energy range from 20 eV to 1 keV.To reduce the development time and cost, BESSY intends to use proven cavity and cryostat technology developed for the TESLA linear collider. However, the cryogenic load per cavity is approximately 15 to 20 times higher than that anticipated for the (pulsed) TESLA operation. This paper describes possible modifications of the cryostat design to accommodate these additional losses.Superconducting RF cavities are the basis of the FEL accelerator providing the driving electron beam with 2.25 GeV. The accelerator consists of five cold sections separated by warm sections reserved for bunch compression and beam extraction. The total refrigeration load will be covered by a single refrigerator. Several possible layouts of the cryogenic system are described and their advantages and disadvantages are discussed

Additional details

Identifiers

Publishing Information

Journal Title
AIP Conference Proceedings
Journal Volume
710
Journal Issue
1
Journal Page Range
p. 357-362
ISSN
0094-243X
CODEN
APCPCS

Conference

Title
Cryogenic engineering and international cryogenic materials conference on advances in cryogenic engineering
Acronym
CEC 2003
Dates
22-26 Sep 2003
Place
Anchorage, AK (United States)

Optional Information

Notes
(c) 2004 American Institute of Physics