Modernization and power increase nuclear power plant Laguna Verde (Mexico)
Description
The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Uprate, to achieve a safe and reliable operation of the plant at 120% of its original thermal power. The scope includes the design, engineering training, supply of equipment, dismantling, installation, testing and commissioning. The duration of the project is 4 years (82007-2010), and all the modifications have been implemented in four outages, two per unit. The main modification carried out are the change of the condenser, moisture separator and main steam reheaters, the feedwater haters, the turbogenerator and its auxiliaries, transformers, isolated phase bus and main circuit breaker, etc. (Author)
Additional details
Additional titles
- Original title (Spanish)
- Modernizacion y aumento de potencia de la central nuclear Laguna Verde (Mexico)
Publishing Information
- Journal Title
- Nuclear Espana (1996)
- Journal Volume
- 315
- Journal Page Range
- p. 42-48
- ISSN
- 1137-2885
INIS
- Country of Publication
- Spain
- Country of Input or Organization
- Spain
- INIS RN
- 42046577
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- INSTALLATION; MOISTURE; NUCLEAR ENERGY; NUCLEAR FACILITIES; NUCLEAR POWER PLANTS; POWER PLANTS; POWER REACTORS; REACTOR DISMANTLING; REMOTE AREAS; SAFETY; TESTING; THERMAL CYCLING
- Descriptors DEC
- DEMOLITION; ENERGY; NUCLEAR FACILITIES; POWER PLANTS; REACTORS; THERMAL POWER PLANTS