Published 1985 | Version v1
Miscellaneous

Status of the HERA-project

Creators

  • 1. Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany, F.R.)

Description

Status of the ep project HERA with the designed luminosity of 3.1x1031 cmsup(-2) secsup(-1) is described. General layout and layout of the interaction region is shown. The progress of the electron ring and proton ring is described. Layout of the refrigeration system is shown. At the beginning of 1985 the boring machine will start with the tunneling, which is expected to be completed at the end of 1987. The electron ring is expected to be finished early is 1988, the proton ring one year later. Experimentation could start in 1990

Additional details

Additional titles

Original title (no language)
Trudy devyatogo Vsesoyuznogo soveshchaniya po uskoritelyam zaryazhennykh chastits. Tom 2.

Publishing Information

Imprint Title
Proceedings of the 9. All-union conference on charged particle accelerators. V. 2
Journal Page Range
p. 407-412.
Report number
INIS-SU--369

Conference

Title
9. All-union conference on charged particle accelerators.
Dates
16-18 Oct 1984.
Place
Dubna (USSR).

INIS

Country of Publication
USSR
Country of Input or Organization
USSR
INIS RN
17089199
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM LUMINOSITY; COLLIDING BEAMS; ELECTRON BEAMS; FEASIBILITY STUDIES; GEV RANGE 10-100; GEV RANGE 100-1000; HEAT STORAGE; PROTON BEAMS
Descriptors DEC
BEAMS; ENERGY RANGE; ENERGY STORAGE; GEV RANGE; LEPTON BEAMS; NUCLEON BEAMS; PARTICLE BEAMS; STORAGE

Optional Information

Notes
Imprint:Trudy devyatogo Vsesoyuznogo soveshchaniya po uskoritelyam zaryazhennykh chastits. Tom 2.