Published March 23, 1992
| Version v1
Journal article
Indian gas field development plan aims for quick production
Description
The development of a new oil or gas field involves construction of various downstream facilities such as field flow lines, trunk lines, oil and gas collecting and processing stations, and transportation to refineries and consuming centers. This paper reports that it is essential that these facilities be built on a schedule that allows the products to be transported and processed as early as possible. Unless such an approach is initiated, the wells producing crude oil or natural gas will need to be shut-in in the absence of the other relative facilities. For quick returns on the investments, a realistic program and careful evaluation of the schedule is needed to ensure that early commissioning of the fields is possible
Additional details
Publishing Information
- Journal Title
- Oil and Gas Journal
- Journal Volume
- 90
- Journal Issue
- 12
- Series
- Oil Gas J.
- Journal Page Range
- 98-102
- ISSN
- 0030-1388
- CODEN
- OIGJA
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 23054815
- Subject category
- S02: PETROLEUM; S03: NATURAL GAS;
- Descriptors DEI
- INDIA; NATURAL GAS FIELDS; NATURAL GAS WELLS; OIL FIELDS; OIL WELLS; PLANNING; RESOURCE DEVELOPMENT; REVIEWS
- Descriptors DEC
- ASIA; DEVELOPING COUNTRIES; DOCUMENT TYPES; GEOLOGIC DEPOSITS; MINERAL RESOURCES; NATURAL GAS DEPOSITS; PETROLEUM DEPOSITS; RESOURCES; WELLS