Current status of the active test at RRP and development programs for the advanced melter

  • 1. Japan Nuclear Fuel Ltd., Rokkasho, Aomori (Japan)

Description

The vitrification facility in Rokkasho Reprocessing Plant started the active tests to solidify HAW into the glass in 2007 which was the examination of the final stage before the operation, but the active test had to be discontinued due to the trouble of glass melter operation with down of pouring by deposit of noble metals on the melter bottom. After the equipment and operating conditions were improved in response to the result of the mock-up tests, a series of active tests were restarted active tests in May, 2012. These tests were finished with enough confirmation of stability in the state such as glass temperature and controlling the noble metals. JNFL has been developed the advanced melter, Joule heated ceramic melter, and the design of the advanced melter is largely different from the existing one. For the confirmation of the advanced melter performances, the full-scale inactive tests had been performed and successfully finished. This paper describes outline of development for advanced melter in Rokkasho Reprocessing Plant. (author)

Additional details

Publishing Information

Journal Title
Genshiryoku Bakkuendo Kenkyu (Online)
Journal Volume
23
Journal Issue
2
Journal Page Range
p. 175-180
ISSN
2186-7135