Published December 31, 1972
| Version v1
Report
Restricted
Pilgrim Nuclear Power Station. Drift of setpoints on pressure switches, December 22, 1972 and December 23, 1972; loss of turbine oil pressure, December 30, 1972
Creators
Description
no abstract available
Availability note (English)
MF available from INIS under the Report Number.
Files
Additional details
Publishing Information
- Imprint Pagination
- 3 p.
- Report number
- DOCKET-50293--110
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 4061694
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Descriptors DEI
- CALIBRATION; ECCS; FAILURES; LEGAL ASPECTS; PILGRIM REACTOR; REACTOR COOLING SYSTEMS; REACTOR LICENSING; REACTOR OPERATION; SWITCHES
- Descriptors DEC
- BWR TYPE REACTORS; ELECTRICAL EQUIPMENT; ENRICHED URANIUM REACTORS; LICENSING; OPERATION; POWER REACTORS; REACTOR COMPONENTS; REACTOR SAFETY; REACTOR SAFETY EXPERIMENTS; REACTORS; SAFETY; WATER COOLED REACTORS; WATER MODERATED REACTORS