Published February 27, 1998 | Version v1
Report

Repository Surface Design Site Layout Analysis

Description

The purpose of this analysis is to establish the arrangement of the Repository surface facilities and features near the North Portal. The analysis updates and expands the North Portal area site layout concept presented in the ACD (Reference 5.5), including changes to reflect the resizing of the Waste Handling Building (WHB), Waste Treatment Building (WTB), Carrier Preparation Building (CPB), and site parking areas; the addition of the Carrier Washdown Buildings (CWBs); the elimination of the Cask Maintenance Facility (CMF); and the development of a concept for site grading and flood control. The analysis also establishes the layout of the surface features (e.g., roads and utilities) that connect all the repository surface areas (North Portal Operations Area, South Portal Development Operations Area, Emplacement Shaft Surface Operations Area, and Development Shaft Surface Operations Area) and locates an area for a potential lag storage facility. Details of South Portal and shaft layouts will be covered in separate design analyses. The objective of this analysis is to provide a suitable level of design for the Viability Assessment (VA). The analysis was revised to incorporate additional material developed since the issuance of Revision 01. This material includes safeguards and security input, utility system input (size and location of fire water tanks and pump houses, potable water and sanitary sewage rates, size of wastewater evaporation pond, size and location of the utility building, size of the bulk fuel storage tank, and size and location of other exterior process equipment), main electrical substation information, redundancy of water supply and storage for the fire support system, and additional information on the storm water retention pond.

Additional details

Identifiers

Publishing Information

Imprint Pagination
[vp.]
Report number
BCB--000000-01717-0200-00007/REV.02

Optional Information

Contract/Grant/Project number
AC08-91RW00134
Funding organization
US Department of Energy (United States)