Operate-shutdown decision and test policy of safety systems on a nuclear power plant

  • 1. Institut National de Recherche d'Informatique et d'Automatique (INRIA), Domaine de Voluceau, 78 -Rocquencourt (France)
  • 2. CEA Centre d'Etudes Nucleaires de Fontenay-aux-Roses, 92 (France). Dept. de Surete Nucleaire
  • 3. Armines, 75-Paris. (France)

Description

It is shown that operate-shutdown decision on a main system and test policy in a safety system have to be considered jointly. Two criteria are taken into account: an economic criterion (loss of production) and a risk criterion (risk of accident). A method is described in order to evaluate these two criteria according to given policies and operate-shutdown rules. This method leads to the optimisation of test policies and of operate-shutdown rules. Minimisation of loss of production and risk of accident is determined. (author)

Additional details

Publishing Information

Imprint Title
Reliability '81
Journal Page Range
p. 5B/4/1-5B/4/11.

Conference

Title
3. National reliability conference.
Dates
29 Apr - 1 May 1981.
Place
Birmingham, UK.

INIS

Country of Publication
United Kingdom
Country of Input or Organization
United Kingdom
INIS RN
13692142
Subject category
S61: RADIATION PROTECTION AND DOSIMETRY;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
NUCLEAR POWER PLANTS; OPTIMIZATION; REACTOR OPERATION; REACTOR SAFETY; REACTOR SHUTDOWN; RISK ANALYSIS
Descriptors DEC
NUCLEAR FACILITIES; OPERATION; POWER PLANTS; SAFETY; THERMAL POWER PLANTS