Published June 2013 | Version v1
Journal article

Emergency reload design for U1C6 of Tianwan nuclear power station

  • 1. China Nuclear Power Engineering Co., Ltd., Beijing (China)

Description

If the fuel assemblies were found to be broken or unable to be returned to the core (due to any reasons) during the period of reactor shut down, an emergency reload design had to be required. Assuming that one assembly was broken during the operation of the 5th cycle of Unit l (U1C5) in Tianwan Nuclear Power Station (TNPS), an emergency reload research for U1C6 was finished to all the possible conditions. According to the actual problem that the 84th assembly of U1C5 was found to be broken, an emergency reload design for U1C6 was performed with great efficiency and effectiveness. The first emergency design achieved in this paper was approved successfully by the National Nuclear Safety Administration through the safety evaluation process, and has been currently employed at TNPS. (authors)

Additional details

Publishing Information

Journal Title
Atomic Energy Science and Technology
Journal Volume
47
Journal Issue
suppl
Journal Page Range
p. 172-175
ISSN
1000-6931

Optional Information

Notes
1 fig., 4 tabs., 2 refs.