Capabilities required to conduct the LLNL plutonium mission

Description

This report outlines the LLNL plutonium related mission anticipated over the next decade and defines the capabilities required to meet that mission wherever the Plutonium Facility is located. If plutonium work is relocated to a place where the facility is shared, then some capabilities can be commonly used by the sharing parties. However, it is essential that LLNL independently control about 20000 sq ft of net lab space, filled with LLNL controlled equipment, and staffed by LLNL employees. It is estimated that the cost to construct this facility should range from $140M to $200M. Purchase and installation of equipment to replace that already in Bldg 332 along with additional equipment identified as being needed to meet the mission for the next ten to fifteen years, is estimated to cost $118M. About $29M of the equipment could be shared. The Hardened Engineering Test Building (HETB) with its additional 8000 sq ft of unique test capability must also be replaced. The fully equipped replacement cost is estimated to be about $10M. About 40000 sq ft of setup and support space are needed along with office and related facilities for a 130 person resident staff. The setup space is estimated to cost $8M. The annual cost of a 130 person resident staff (100 programmatic and 30 facility operation) is estimated to be $20M

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE92003049; NTIS; INIS; US Govt. Printing Office Dep.

Files

23021266.pdf

Files (1.1 MB)

Name Size Download all
md5:51c8064afa7396a127ba08771f757c6f
1.1 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
12 p.
Report number
UCRL-ID--108601

Optional Information

Contract/Grant/Project number
Contract W-7405-ENG-48
Funding organization
USDOE, Washington, DC (United States).