Survey of nuclear power plant construction costs, 1983
Description
This report presents cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in the construction pipeline, collected on Form EIA-254. The information on US nuclear power plants in the construction pipeline is reported voluntarily each quarter by the electric utilities. This report presents the data collected in the first quarter of 1983 on the 71 nuclear units in the construction pipeline. Historical data on 73 units, totalling 57,287 net megawatts (MWe) of design capacity, in commercial operation as of March 31, 1983, are also given. Three types of information are included: plant characteristics and ownership, construction costs, and construction schedule or chronology. Summary statistics are presented on direct component costs and construction leadtimes for a sample of operating units and units in the construction pipeline. The reactor-specific cost data included in Chapter 4 are the estimated final nuclear production plant costs and, for units in the construction pipeline, the disbursed and sunk costs as of March 31, 1983. 7 figures, 5 tables
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A04/MF A01; 1 - GPO as DE84004380.
Files
Additional details
Publishing Information
- Imprint Pagination
- 74 p.
- Report number
- DOE/EIA--0439(83)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 15047478
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY; S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Descriptors DEI
- CONSTRUCTION; COST; NUCLEAR POWER PLANTS; OWNERSHIP; USA
- Descriptors DEC
- DEVELOPED COUNTRIES; NORTH AMERICA; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS