Hochtemperatur-Kernkraftwerk GmbH (HKG). A joint European enterprise. Hamm-Uentrop - Westfalen power plant. Annual report 1990

Description

In the period under review, the specific activities carried out in addition to the standing tasks of monitoring, inspection and maintenance of the process systems required for shutdown operation, were the following: providing evidence of the optimal performance of core unloading operations; preparing the system for core unloading; preparing the documents to be submitted for the licensing of decommissioning operations, preservation of the water/steam cycle, shutdown of operating systems. (orig.)

Availability note (English)

Available from FIZ Karlsruhe.

Abstract (German)

Die wesentlichen Aktivitaeten im Berichtszeitraum bestanden neben der Ueberwachung, Wartung und Instandhaltung der fuer den Stillstandsbetrieb erforderlichen Betriebssysteme in der Nachweisfuehrung fuer die optimale Core-Entladung, Vorbereitung der Anlage zur Core-Entladung, Unterlagenerstellung zum Genehmigungsverfahren der Stillegung, Konservierung des Wasser-Dampf-Kreislaufes, Stillsetzung von Betriebssystemen. (orig.)

Additional details

Additional titles

Original title (German)
Hochtemperatur-Kernkraftwerk GmbH (HKG). Gemeinsames europaeisches Unternehmen. Hamm-Uentrop - Kraftwerk Westfalen. Geschaeftsbericht 1990