Published 1992 | Version v1
Report Restricted

Radioactive waste package assay facility. Volume 3. Data processing

Description

This report, in three volumes, covers the work carried out by Taylor Woodrow Construction Ltd, and two major sub-contractors: Harwell Laboratory (AEA Technology) and Siemens Plessey Controls Ltd, on the development of a radioactive waste package assay facility, for cemented 500 litre intermediate level waste drums. Volume 3, describes the work carried out by Siemens Plessey Controls Ltd on the data-processing aspects of an integrated waste assay facility. It introduces the need for a mathematical model of the assay process and develops a deterministic model which could be tested using Harwell experimental data. Relevant nuclear reactions are identified. Full implementation of the model was not possible within the scope of the Harwell experimental work, although calculations suggested that the model behaved as predicted by theory. 34 figs., 52 refs., 5 tabs

Availability note (English)

MF available from INIS under the Report Number.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Subtitle (English)
Task 3: characterization of radioactive waste forms. A series of final reports (1985-89) No. 40

Publishing Information

Imprint Pagination
297 p.
Report number
EUR--13870/3

Optional Information

Contract/Grant/Project number
Contract FI1W0102/0244-UK