Published October 1989 | Version v1
Report Open

The in-pile proving test for fuel assembly of Qinshan nuclear power plant

  • 1. Academia Sinica, Beijing, BJ (China). Inst. of Atomic Energy

Description

The in-pile proving test for fuel assembly of Qinshan nuclear power plant had been conducted in the experimental loop of HWRR at IAE (Institute of Atomic Energy) in Beijing, China, from January 1985 to December 1986. Average burnup of 27000 MWd/tU and peak burnup of 34000 MWd/tU of fuel rod had already been reached. The basic status of the experiment are described, emphasis is placed on the discussion of proving test parameters and analysis of experiment results

Availability note (English)

MF available from INIS under the Report Number.

Files

23075896.pdf

Files (302.2 kB)

Name Size Download all
md5:734da349e39b29eeec06d32c0567a2da
302.2 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
CNIC--00340

Optional Information

Secondary number(s)
IAE--0067.