Published December 10, 1998 | Version v1
Journal article

Longitudinal and transverse feedback systems for BESSY-II

  • 1. BESSY-II, Rudower Chaussee 5, 12489 Berlin (Germany)

Description

The commissioning of the high-brilliance synchrotron light source BESSY-II in Berlin started in April 1998. Within the commissioning period, bunch-by-bunch feedback systems to counteract longitudinal and transverse multibunch instabilities will be installed. This paper reviews their design and present status

Additional details

Identifiers

Publishing Information

Journal Title
AIP Conference Proceedings
Journal Volume
451
Journal Issue
1
Journal Page Range
p. 537-544
ISSN
0094-243X
CODEN
APCPCS

Conference

Title
8. beam instrumentation workshop
Dates
4-7 May 1998
Place
Stanford, CA (United States)

INIS

Country of Publication
United States
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
40072818
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM BUNCHING; BEAM MONITORING; BEAM MONITORS; BESSY STORAGE RING; COMMISSIONING; DESIGN; ELECTRON BEAMS; FEEDBACK; INSTABILITY; SYNCHROTRON RADIATION SOURCES
Descriptors DEC
BEAM DYNAMICS; BEAMS; DYNAMICS; LEPTON BEAMS; MEASURING INSTRUMENTS; MECHANICS; MONITORING; MONITORS; PARTICLE BEAMS; RADIATION SOURCES; STORAGE RINGS

Optional Information

Notes
(c) 1998 American Institute of Physics.