Operator/instrumentation interactions during the Three Mile Island incident

Description

A discussion is presented of the operator/instrumentation interactions which had an effect on the course of the incident at the Three Mile Island-2 Nuclear Power Plant. A brief review of the sequence of occurrences at TMI-2 over the first 16 hours of the incident is given with particular emphasis on operator/instrumentation interactions. A breakdown of the six major items that seemed to have contributed to the characteristics of the incident is then given and also an outline of some of the currently proposed operator/instrumentation improvements. The six major items involve water level indication in the reactor, electromatic relief valve operation, auxiliary feed-water flow indication, containment isolation, extended range instrumentation, and computer readout

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
4 p.
Report number
UCRL--82227

Conference

Title
IEEE symposium on nuclear power systems.
Dates
19 Oct 1979.
Place
San Jose, CA, USA.

Optional Information

Secondary number(s)
CONF-791060--1.