Published October 1985
| Version v1
Journal article
Set-up for steam generator tube bundle washing after explosion expanding the tubes
Creators
Description
Set-up for steam generator tube bundle washing after the explosion expanding of tubes is described. Washing is accomplished by distillate. Steam is added to distillate for heating, and compersed air for preventing hydraulic shock. The set-up is equiped by control equipment. Set-up performances are presented. Time for one steam generator washing constitutes 8-12 h. High economic efficiency is realized due to the set-up introduction
Additional details
Additional titles
- Original title (Russian)
- Стенд для промывки трубного пучка парогенератора после вальцовки трубок взрывом
Publishing Information
- Journal Title
- Ehnergomashinostroenie
- Journal Issue
- no.10
- Series
- Ehnergomashinostroenie.
- ISSN
- 0131-1336
- CODEN
- EGMSA
INIS
- Country of Publication
- Russian Federation
- Country of Input or Organization
- USSR
- INIS RN
- 17036547
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- FLOWSHEETS; PERFORMANCE; STEAM GENERATORS; SURFACE CLEANING; TUBES
- Descriptors DEC
- BOILERS; CLEANING; DIAGRAMS; INFORMATION; SURFACE FINISHING; VAPOR GENERATORS