Published 1985
| Version v1
Report
Performance of the 100 keV chopper/buncher system of the NBS-Los Alamos RTM injector
Creators
- 1. National Bureau of Standards, Gaithersburg, MD
Description
The purpose of the chopper/buncher system for the RTM injector is to chop a 100 keV 5 mA dc electron beam into 600-long pulses at 2380 MHz and then bunch these beam pulses to 100 at insertion into the 5 MeV injector linac. These beam manipulations must contribute a minimum increase in the phase space of the beam such that, at the entrance to the injector linac, the transverse emittance is less than 5π mm-mrad. Phase-shift measurements on the chopped beam indicate that the bunching fields are sufficient to achieve the required longitudinal compression. Beam envelope measurements, using wire scanners on the chopped and bunched beam, show that the emittance remains within design goals
Additional details
Publishing Information
- Imprint Title
- IEEE Transactions on Nuclear Science, Volume NS-32, No. 5. 1985 Particle accelerator conference. Accelerator engineering and technology
- Journal Page Range
- p. 3089-3091.
- Report number
- DOE/ER/40238--1
Conference
- Title
- Particle accelerator conference.
- Dates
- 13-16 May 1985.
- Place
- Vancouver (Canada).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 18023709
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATORS; BEAM BUNCHERS; BEAM EMITTANCE; BEAM INJECTION; BEAM PULSERS; BEAM TRANSPORT; PHASE STABILITY
- Descriptors DEC
- STABILITY