Published 2005
| Version v1
Miscellaneous
Open
I and C modernization of Loviisa Nuclear Power Plant
Description
A brief review of the Framatome finished and current safety I and C project is given. The general concept for modernization of the instrumentation and control systems of the Loviisa NPP units 1 and 2 is presented. An overview on the scope of supply and time schedule is also shown
Availability note (English)
Available from INIS in electronic formFiles
37038505.pdf
Files
(763.1 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:e6ba70b2e24e4de73a1fac0eb5090d66
|
763.1 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 22 p.
- Report number
- INIS-BG--1053
Conference
- Title
- The Future of Nuclear Energy on the Balkans: Security of Energy Supply and Nuclear New Builds
- Acronym
- BULATOM International Nuclear Forum
- Dates
- 15-18 Jun 2005
- Place
- Varna (Bulgaria)
INIS
- Country of Publication
- Bulgaria
- Country of Input or Organization
- Bulgaria
- INIS RN
- 37038505
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONTROL ELEMENTS; CONTROL ROOMS; LOVIISA-1 REACTOR; LOVIISA-2 REACTOR; MODIFICATIONS; REACTOR CONTROL SYSTEMS; REACTOR INSTRUMENTATION; REACTOR SAFETY; SCHEDULES
- Descriptors DEC
- CONTROL SYSTEMS; ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTORS; SAFETY; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWER TYPE REACTORS
Optional Information
- Notes
- 17 figs., 2 tabs.